Analysis Of The Effect Of Foreword Performance On The Quality Of Construction Projects In Tarakan City

Authors

  • eko prihartanto Study Program of Civil Engineering Faculty of Engineering, Universitas Borneo Tarakan https://orcid.org/0000-0002-7440-8653
  • Iif Ahmad Syarif Study Program of Civil Engineering Faculty of Engineering, Universitas Borneo Tarakan
  • Edy Utomo Study Program of Civil Engineering Faculty of Engineering, Universitas Borneo Tarakan

DOI:

https://doi.org/10.37638/gatotkaca.v2i2.387

Keywords:

construction, foreman’s, Tarakan city

Abstract

Tarakan City is a developing city for development where the city has undergone many developments so that it requires quality human resources in managing development. If human resources are able to manage development with good quality, it can be said to be successful in the development process. To improve the quality of a construction project, it is necessary to pay attention to the determination of workers with good quality, therefore before starting the construction of a construction project it is necessary to make a selection made by the contractor of the foremen workers which is important so that the foremen selected have good quality. So far, the discussion in Tarakan City is not yet known how the foreman's performance affects the quality of construction project work in Tarakan City.

In this study, the type of research used is quantitative research using a Likert scale. Place and time of research in the Project for Improving the Quality of Slums in the Karang Rejo Area of Tarakan City. The data used is the foreman's performance data on construction projects in Tarakan City with the foreman's performance aspects seen are work ability, participation, work facilitation, bias, providing examples of experience on the quality of construction projects in Tarakan City. Supporting data from the internet, books and so on.

The results obtained from this study are the indicators that most influence the quality of construction work in Tarakan City, namely the foreman's ability to read and understand working drawings, being able and skilled in doing his work, being able to organize materials. well and able to organize the tools well. able to solve problems that occur in the field.

References

Dewi, A.A Diah Parami. 2016. Analisa Aspek Sumber Daya Manusia Terhadap Kinerja Pada Proyek Konstruksi di Kabupaten Badung. Vol 20, No 2 :103-109.

Mandagi, Robert J.M. 2019 . Model Risiko Pengelolaan SDM Konstruksi Dalam International Joint Operation Pada Proyek Infrastruktur Jalan Tol Manado-Bitung. Vol 7, No 1 : 113-126

Mulyadi, Lalu. 2014.Evaluasi Pengaruh Kinerja Mandor Terhadap Kualitas Pekerjaan Pembangunan Gedung di Kabupaten Malang. Jurnal Info Manpro Vol 5, No. : 1-12.

Musthofa. 2015. Analisa Pengaruh Kinerja Mandor Terhadap Kualitas Proyek Konstruksi Di Kota Tuban. Jurnal Teknik Sipil. Vol 8, No. 2 : 149-162.

Sugiyono. 2011. Metode Penelitian Kuantitatif, Kualitatif dan R&D. Bandung: Afabeta

Sujarweni, V. Wiratna. 2014. Metode Penelitian: Lengkap, Praktis, dan Mudah Dipahami. Yogyakarta: Pustaka Baru Press.

Zainullah, Amin. 2012. Pengaruh Upah, Kemampuan, dan Pengalaman Kerja Terhadap Kinerja Pekerja Pelaksanaan Bekisting pada Pekerjaan Beton. Vol 6, No 2 :125-133.

Published

2021-12-31

Issue

Section

Articles